|
|
The Vesey Bridge will be closed intermittently on March 23rd
|
This Saturday, March 23rd, the annual electrical-generator test at 200 Vesey Street will bring intermittent closures to the Vesey Street pedestrian bridge over West Street. The work will be performed between 7 a.m. and 10 p.m., and during the power interruptions, security will redirect pedestrians to the nearest at-grade crossing. Power to 200 Vesey Street also will be interrupted at times throughout the day.
|